When cost per ton rises
Fuel alone can make up 35 to 40 percent of a mining contractor’s total cost, according to the Indonesian Mining Services Association (ASPINDO), and a single large site can run around 2,000 trucks from several contractors. Every one of those liters is burned by a specific machine, in a specific pit, during a specific shift.
When cost per ton rises, the cause usually sits in one of four places: more was spent, less was produced, equipment worked less productively, or costs were posted to the wrong place. The difference matters. If a mine spends IDR 10 billion to move 100,000 tons, its cost is IDR 100,000 per ton. Let production fall 20 percent with the same spending, and cost per ton rises 25 percent without a single extra rupiah going out.
Telling these causes apart requires two kinds of information to meet: what was spent, and what was produced, by which equipment, in which pit, in which period. Equipment data is where they meet. It does not explain cost per ton on its own, but without it, the explanation rarely holds together.
Every cost needs an appropriate address
Every cost should land somewhere that explains it. For equipment-related spending, such as fuel, parts, repairs and operator labor, that address is the unit, the activity and the cost classification. The equipment register, the master record of every unit and its attributes, is the address book for that part of the cost base.
Not every cost needs a unit. Mine planning belongs to a department, site security to a cost center, contractor overburden removal to a contract, pit and volume, and shared workshop overhead to a cost center with a consistent allocation rule. The problem is not costs without a unit ID. It is direct equipment costs posted to a general bucket, and shared costs spread without a defensible basis.
When both are handled well, cost can be divided by the right production figure (BCM for overburden, tons for coal getting, tons mined, processed or sold for minerals) over the same scope and period.

Equipment-related costs need an equipment identity; other costs need their own attribution. Cost per ton becomes explainable when both meet validated production volumes.
Four ways fragmented equipment data obscures cost
Units the system does not know, and units that are long gone. A new loader works for three months before it is registered, so its fuel and parts are charged to the workshop. A truck transferred to another site stays on the old site’s list. Both distort cost per unit, in opposite directions.
One machine, multiple identifiers. Dispatch calls it HT-07, the ERP calls it DT-007, the fuel log uses its door number, and the OEM portal knows only the serial number. Different identifiers are normal, since each system has its own reasons. The problem starts when nothing reconciles them. Like a bearing filed under three different item codes, the truck’s history ends up split across systems. One authoritative equipment identity, mapped to each system’s identifier, fixes this without forcing every system to use the same code.
No hierarchy, and no assignment history. Hierarchy describes what a truck consists of: engine, transmission, hydraulics, wheels. Assignment describes where and how it is used: site, pit, fleet, activity and the dates in between. Trucks move between pits without changing their components. Without effective-dated assignments, last quarter’s costs follow the truck to wherever it sits today, and the pit report quietly rewrites history.
Attributes without context. Model, capacity class, ownership and serial number make like-for-like comparison possible, but not sufficient. Two trucks of the same model can face different haul distances, gradients, payloads, ages and idle times. Fair comparison needs operational records such as hours, fuel, payload and distance next to the register, not inside it.
Individually, these gaps look minor. Together, they turn cost per ton into a number that can be reported but not explained.
The contractor fleet blind spot
Many Indonesian mines, coal operations in particular, move most of their material with contractor equipment. Those units belong to the contractor, so they rarely appear in the owner’s register. Ownership, however, is not the same as economic responsibility.
The owner pays for that equipment through progress claims (volume times contract rate), often supplies the fuel, and carries the effect of contractor productivity on its own cost per ton. The sums are material: in 2025, PT Bukit Asam’s mining services costs reached IDR 12.98 trillion, more than a third of its IDR 36.39 trillion cost of revenue, as reported by EmitenNews.
Contractor costs need their own addresses: claims by contract, activity, pit and volume; fuel issued to contractor units by unit and pit; and a light register of contractor units with unit ID, contractor, pit and activity. That is what lets management separate a higher rate from weaker performance.
Beyond the equipment register
A register is necessary but not sufficient. What makes cost explainable is the discipline around it, and knowing which data belongs where.
| Layer | What it holds | Where it lives |
| Master attributes | Unit ID, model, capacity class, ownership, serial number | Equipment registers |
| Assignment history | Site, pit, fleet, activity, effective dates | Register or operations system, linked by unit ID |
| Operational records | Hours, fuel, payload, distance, production | Dispatch, fuel and production systems |
| Financial transactions | Parts, services, labor, allocations | ERP |
Keeping those layers connected takes four things:
- Clear ownership of equipment identity across sites, with operations, maintenance and finance agreeing on definitions.
- Processes that update the record as part of mobilization, transfers, disposals and contractor onboarding.
- A routine control: no equipment-related transaction without a valid equipment identity. Emergency repairs, temporary mobilization and safety-critical work can proceed as authorized exceptions, recorded and reconciled afterwards.
- Integration between ERP, maintenance, dispatch, fuel and production systems, so cost and tonnage refer to the same unit, pit and period.
Test your cost visibility with one truck
Pick one haul truck and last month. Ask the team to show, without building a spreadsheet:
- every work order, fuel issue and operating hour recorded against it, under one identity;
- which pits and activities it worked in, and when;
- what it moved in those assignments, in BCM or tons;
- its cost per operating hour and its share of cost per ton, for the same period finance reports.
A simple illustration: work order WO-001 on truck HT-07 uses IDR 3 million in parts, IDR 1.5 million in external services and IDR 0.5 million of internal labor, IDR 5 million in total. If all three land on HT-07, its pit assignment and the right period, and the tonnage it moved is recorded against the same assignment, the cost per ton built on them can be explained.
If the answer needs several spreadsheets and manual reconciliation, the place to start is not a new dashboard. It is the data and the discipline underneath it.
From cost reporting to cost accountability
Knowing your cost per ton is not the same as understanding it. With reliable equipment data, disciplined processes and integrated financial information, management can separate a fuel price increase from excess consumption, maintenance spending from declining productivity, higher contractor rates from weaker performance, and real inefficiency from misallocation.
Understanding where mining costs are incurred is the first step toward controlling them. Pratesis works with mining companies to connect equipment, maintenance, supply chain, operational and financial information so management can better understand the economics of their operations. If your organization is looking to improve cost traceability across owned and contractor-operated fleets, we welcome a conversation about your current operating environment.